CPM Enterprise

CPM Enterprise

Carolina Projects Management Enterprise

Mixed-Use Buildings

Washington Township Municipal Complex Phase II

Location: Mansfield, OH.

Brief: Site work and new construction of a municipal facility in Mansfield, Ohio. Completed plans call for the construction and site work of a municipal facility. For Phase II.

Scope of Work: Initiating Meeting – Activity list Draft – Preliminary Schedule – Baseline Schedule – Monthly Updates.

SKY B19 Swing Space

Location: San Bruno, CA.

Brief: Renovation of an educational facility in San Bruno, California. Completed plans call for the renovation of a educational facility.

Scope of Work: Initiating Meeting – Activity list Draft – Preliminary Schedule – Baseline Schedule – Cost Loading – Narrative Report.

Darby Park Restroom Phase 1

Location: Inglewood, CA.

Brief: Demolition, site work, and new construction of a playground/park / athletic field in Inglewood, California.Demo interior of the existing restroom to convert to a storage facility, demo existing wading pool, and construct new restroom building.

Scope of Work: Initiating Meeting – Activity list Draft – Preliminary Schedule – Baseline Schedule.

Construction of Pymatuning State Park - Rehabilitate State Park Campground Facilities

Location: Inglewood, CA.

Brief: Renovation of a playground/park / athletic field in Linesville, Pennsylvania. The project involves the rehabilitation of the park’s infrastructure, amenities, and campsites. The work generally includes well pump installation, rehabilitation of buildings/water tower/pump stations, installation of water piping, repair and installation of sewerage piping, installation of all required electrical / controls, installation of pre-fabricated buildings, resurfacing of all roads, installation of boat ramp, and installation of a fishing pier.

Scope of Work: Initiating Meeting – Activity List Draft – Preliminary Schedule – Baseline Schedule – Monthly updates.

Dublin Cultural Arts Center

Location: Dublin, CA.

Brief: Construction, renovation, and site work for a fire/police facility and fitness/recreation center. The proposed project involves renovating the existing police department building in the Dublin civic center.

Scope of Work: Initiating Meeting – Activity list Draft – Preliminary Schedule – Baseline Schedule – Monthly Updates.

Camp Butler GSE - National Cemetery

Location: Springfield, IL.

Brief: Site work and paving for a mixed-use development in Springfield, Illinois. Completed plans call for site work for a religious / funeral development; water / sewer project; road / highway.

Scope of Work: Initiating Meeting – Activity list Draft – Preliminary Schedule – Baseline Schedule – Monthly Updates.

Low Country

Location: Charleston, SC.

Brief: Constructing a 52,000 square foot, state-of-the-art facility. The manufacturing space is divided into (4) separate divisions; cabinetry, millwork, finishing, and a climate controlled shipping department.

Scope of Work: Drawings Review – Ordering Materials -Estimate Change Order – Cost Control – Schedule control – Lifting sequence and crane path

SCI Rockview

Location: Bellefonte, PA.

Brief: Renovation of the existing building’s windows and elevations while the employees are working.

Scope of Work: Initiating Meeting – Activity List Draft – Preliminary Schedule – Baseline Schedule – Monthly updates.

Cross pointe Church

Location: Cary, NC.

Brief: They needed to extend the project by adding 92,363 square foot to the existing structure. The method of construction used was Tilt Up construction.

Scope of Work: Drawings Revision – Simulate the lifting sequence using Revit – Preliminary Schedule – Baseline Schedule – Monthly Schedule updates – Schedule Control – Cost Estimation – Cost Control – Progress field meetings to check safety, quality – solve onsite issues and attend preconstruction and pre-pour meetings.