CPM Enterprise

CPM Enterprise

Carolina Projects Management Enterprise

Water and Sewer

Scholl Canyon Landfill Geosynthetic Clay Liner Final Cover Phase I

Location: Glendale, CA.

Brief: site-work for a  municipal facility; and water/sewer project. The work consists of the installation of a geosynthetic clay liner (GCL) final cover system, including soil excavation, grading, soil placement, installation of drainage geocomposite with piping, and installation of polyethylene barrier.

Scope of Work: Initiating Meeting – Activity List Draft -Narrative Report – Preliminary Schedule – Cost Loaded Baseline Schedule – Monthly updates.

New Bedford Sewer Lift Station

Location: North Charleston, SC.

Brief: Constructing over 45 miles of water transmission lines to provide clean drinking water, enhanced fire suppression and economic growth.

Scope of Work: Initiating Meeting – Activity List Draft -Narrative Report –  Preliminary Schedule – Baseline Schedule – Monthly updates.

LMRWS Waterline

Location: North Charleston, SC.

Brief: Constructing over 45 miles of water transmission lines to provide clean drinking water, enhanced fire suppression and economic growth.

Scope of Work: Initiating Meeting – Activity List Draft – Preliminary Schedule – Baseline Schedule – Monthly updates.

Hyperion Water Reclamation Plant Dilute Polymer System Improvements

Location: Los Angeles, CA

Brief: Renovation of a water/sewer project. The project will be constructed at the HWRP, The polymer blending units will be replaced in the Biosolids Dewatering Facility and new units will be installed at the Chemical Storage Facility within the Plant. Scope includes replacement of tanks, pumps, blending units, piping, and appurtenances.

Scope of Work: Initiating Meeting – Activity List Draft -Narrative Report – Preliminary Schedule – Baseline Schedule – Monthly updates.

Sutter Bypass -DWR - Pumping Plants Removal and Rehabilitation

Location: Sacramento, CA.

Brief: Site work and renovation of a water/sewer project which includes the following Principal features: 1. Demolish and dispose of existing reinforced concrete, steel Columns, miscellaneous metal, concrete lining, and fencing. 2. Removal and handling of potentially hazardous materials. 3. Sawcut existing structural concrete and concrete lining. 4. Dewatering. 5. Temporary sheet piles. 6. Gate structure inspection and reconnaissance. 7. Earthwork:

Scope of Work: Initiating Meeting – Activity List Draft -Narrative Report – Preliminary Schedule – Baseline Schedule – Monthly updates.

Trevarno Road Sanitary Sewer and Water Improvements

Location: Livermore, CA.

Brief: site work for a water / sewer project in Livermoreconsists of the installation of new sanitary sewer and potable water mains and services/meters,

Scope of Work: Initiating Meeting – Activity List Draft -Narrative Report – Preliminary Schedule – Baseline Schedule – Monthly updates.

A1A and Jupiter Beach Road Roundabout

Location: Jupiter, FL.

Brief: Site work and paving for a road/highway. This project consists of clearing & and grubbing, embankment, pavement widening, curb & and gutter, sidewalk, street lighting, decorative stamped asphalt, milling & and resurfacing, and all other required work to reconstruct the existing intersection at Jupiter Beach Road and A1A from a T-intersection to a roundabout.

Scope of Work: Initiating Meeting – Activity List Draft -Narrative Report – Preliminary Schedule – Baseline Schedule – Monthly updates.

Replace Domestic Water Valves and Piping - Stratton VA Medical Center

Location: Albany, NY.

Brief: Renovation of a mixed-use development in Albany, New York. plans call to Replace the main domestic hot and cold water feed piping and valves in the subbasement of the hospital (building 1), Stratton VAMC

Scope of Work: Initiating Meeting – Activity List Draft -Narrative Report – Preliminary Schedule – Baseline Schedule – Monthly updates.

Highway Village Strengthen & Replace Water Mains in Modesto.

Location: Modesto, CA.

Brief: Site work and paving for a civil project in Modesto.

This project will replace existing water mains within the Highway Village triangular area generally bounded by Conant on the East, Rumble on the North, and Sisk Road to the Southwest. Existing water mains in this area are old, undersized steel mains that are prone to leaking and low pressures to improve system reliability, flows, and pressures.

Scope of Work: Initiating Meeting – Activity List Draft -Narrative Report – Preliminary Schedule – Baseline Schedule – Monthly updates.